Key Course Objectives
Identify the D25 hardware components.
Identify controls and indications and configure hardware options such as jumpers,
analog input adapters and serial input connections.
Locate and replace field replaceable components such as fuses, memory chips and
resistor DIPs.
Apply features of the software used in the D25 product family.
Identify D25 software components and demonstrate their relationship to hardware,
to each other and to the ConfigPro configuration system.
Copy configuration databases to and from a PC.
Create new and/or edit existing configuration databases.
Download and upload configuration databases using the ConfigPro configuration
system.
Using the WESMAINT and 68K Monitor maintenance utilities, verify correct operation
of the RTU, diagnose operational problems and test and commission the RTU before
placing in service.
Suggested Audience
SCADA / RTU Installation and Maintenance Personnel
Length
5 days
Prerequisites
In order to successfully understand the course material, completion of the following
prerequisites are recommended:
An understanding of RTU and SCADA concepts.
A working knowledge of PCs and Windows.